Hi,
In this case, go to PO - Item Level - conditions tab and change the PB00 value (or req condition type) manually with currency as USD.
Regards,
AKPT
Hi,
In this case, go to PO - Item Level - conditions tab and change the PB00 value (or req condition type) manually with currency as USD.
Regards,
AKPT