Hi Pushkar,

 

BOM is required in order to plan and produce a production lot and to determine its costs. We can use an existing material BOM, create a work breakdown structure BOM for each individual production lot or you can use one work breakdown structure BOM for several production lots of a material.


WBS BOM's are created specific to WBS element of Project. Material BOM's are for Production Planning.


CS71 -  Create WBS BOM

CS72 -  Change WBS BOM

CS73 -  Display WBS BOM

CS20 -  Mass changes

CSPB -  WBS BOM browser

CS01/CS02/CS03 - Create/ change/display material BOM.


Refer to the below thread for more clarification.

Necessity of WBS BOM | SCN

 

Thanks & Regards,

Ramagiri